Thursday 5 August 2010

Test of the motor and Data control Unit

The traking system is tested.
Pietro Zucca connecting the motor to the control Unit.
In the left and right pictures the control unit tested with the control software.
A sreenshot of the software used to track the Sun.

No comments: